Computer Tomography

Computer Tomography
Computer Tomography

The brake energy has to be managed quickly and safely.

Situation

During a CT-Scan the tube rotates 1-2 times each second.

Problem

After the examination of the patient the tube has to be stopped. That causes braking energy.

Goal

The brake energy has to be managed safely and quickly with an external brake resistor.

Brake resistor BWD600047TS-120
Solution

Our safe braking resistor BWD600047TS-120 (240 Watt / 47 Ohm / IP65 / temperature switch) is connected as external braking resistor.

BWx600

The safe brake resistor BWx600 is connected externally and manages the brake energy safely and quickly.

Advantages

Icon
Managing brake energy

The brake energy is handled safely and quickly

Further Advantages

  • The temperature switch monitors the surface of the brake resistor and gives an additional safety feature

Downloads